Would you like more information or assitance with viewing this property? Put an EASYstreet RealtorĀ® to work for you today. Call Byron Weston at 770 298 4707
1379 Branchwood Dr Snellville, Georgia 30078 MLS# 7569527
This spacious ranch-style home features two master bedrooms, ideal for multigenerational families. Conveniently located near both Snellville and Lawrenceville, it offers easy access to shopping, dining, and top-rated schools. The house has a very open concept for a large gathering. Enjoy the comfort of an enclosed sunroom (perfect for a workspace), a screened and covered porch accessible from the master suite, and a large, private fenced backyard surrounded by mature trees. This home offers endless possibilities with no HOA restrictions, a large driveway suitable for trucks or oversized vehicles, extra backyard storage, and an open-concept layout perfect for year-round gatherings. Position of the house allows for total privacy from all sides, with a large front and back yard.
Bathrooms